Project Name: Shellfish Depuration Facility Feasibility Study |
Country: UK |
| - Project Dates: July 2008 - November 2008 | |
Detailed narrative description of project: The Crown Estate wished to assist the development of the UK's shellfish sector through investigating the fesibility of a shellfish depuration facility in Scotland. |
|
Detailed narrative description of actual
services provided by Poseidon Aquatic Poseidon was asked to carry out an initial feasibility study identifying the potential need, volume of trade, logistical requirements, scale and outline costings. |
|